Case studies · delivered, not promised

Proof, not promises.

Real programs run end to end on the LMM, from concept to shipped hardware, across mobility, aerospace and consumer products.

Case studies

The advantage, in the numbers.

Case 01 BNC Messenger C110
Mobility · EV · BNC Motors

A production-ready EV in 9 months.

The full arc ran on the LMM, Lumos renders, Anvil CAD and simulation, then build packages driving machining, fabrication, 3D printing and electronics assembly. A 250 kg-payload fleet motorcycle, under a $1,000 price point.

Client
BNC Motors · India
Scope
Design · Build · Ship
Timeline
2024 · 9 months
18 → 9 moto production
<$1Mprogram cost
100%spec met
Read the full case study →
Case 02 Precision-machined aerospace components
Aerospace · Structural

Flight-critical clamp, held at 10–15 µm.

An aerospace OEM of flight-critical structural hardware needed high-volume overflow without risking quality. LMM-optimized toolpaths cut runtime from seven hours to three on Haas VF2 cells, with First / Middle / Last CMM-SPC inspection on every batch.

Client
Aerospace OEM
Scope
Precision machining · SPC
Timeline
Serial supply · AS9100D
7 → 3 hrsruntime per job
10–15 µmtolerance held
~15 / day*Across 2 machines
Read the full case study →
Case 03 Smart filter-coffee machine
Consumer Appliances

A vending-machine line in 5 weeks.

A smart self-cleaning filter-coffee machine, 100 cups an hour. Anvil re-engineered components to eliminate tooling, the imported refrigeration unit was localized as a sealed swap-cartridge, and a full host-cell line was documented to 400 units/month.

Client
Consumer Appliances brand
Scope
Re-engineer · Localize · Line
Timeline
5 weeks to line
5 wksline stood up
400 / mozero tooling
−20%BOM cost
Read the full case study →
Case 04 NEMI carbon-fibre defense UAS
Defense · UAS

A drone powertrain, fully in-house.

NEMI engineered every core powertrain component, battery, motor, ESC and ground control unit, to build-to-spec standards and stood up in-house production for all of them, delivering an indigenous supply chain for the customer's defense UAS program.

Client
Defense OEM · India
Scope
Powertrain · Build-to-spec
Timeline
4 months · $100k
16 → 4 modevelopment
$100k5× lower cost
4 / 4in-house
Read the full case study →

Your program could be the next one.

Send an RFQ → See the Offerings